Product Engineering Banner
Aerodynamics conference promo

Latest News...

M - Take a look at Issue 4 of
MIRA's new customer newsletter

 

MIRA to host telematics centre

 

MIRA recognised as
Visteon 'Very Important Partner'

 

EMC - Heavy Vehicle Semi-Anechoic Chamber

MIRA's HVSAC is the UK's first independent absorber-lined EMC facility with a 70-Ton floor loading capacity.  The cavernous main chamber boasts impressive dimensions measuring: 20m by 11m by 7m high.  HVSAC's impressive specifcation make it ideal for EMC testing of large defence, agricultural, construction and commercial vehicles up to 70 tonnes gross weight in an RF semi-anechoic environment.

MIRA used advanced modelling techniques, developed through an internally funded research programme, in the design of the chamber.  Rather than lining the whole chamber in costly electromagnetic absorber material, the specialised materials were intelligently restricted to local ‘hot spots’.  This facility optimisation programme reduced the capital build costs without restricting performance. Consequently, the facility hire has been proportionally reduced, saving customers money.

Further details are included on the following brochure:

EMC - HVSAC Heavy Vehicle Semi-Anechoic EMC Chamber pdf (2.2Mb)

Markets

AUTOMOTIVE

-Passenger Cars

-Commercial Vehicles

-PSVs

-Off-Highway

-Motorcycles

-Motorsport

DEFENCE

AEROSPACE

RAIL

Events...

 

British International
Motorshow

London, UK

23 July - 3 August 2008

 

7th MIRA International
Vehicle Aerodynamics
Conference

Coventry, UK

22 - 23 October 2008

 

More Events...

 

 

MIRA Ltd. Registered in England No. 402570.
Registered Office : Watling Street, Nuneaton, Warwickshire, UK. CV10 0TU.
MIRA Home Page Link