News and Events
//
Facilities
//
Careers
//
Press Centre
//
Research
Search the site
MIRA - Smarter Thinking
Our Services
Technology Park
//
About MIRA
//
Contact
Vehicle Engineering
Test Engineering
Defence Engineering
Unmanned Ground Vehicles
Low Carbon Vehicle Engineering
Intelligent Transport Systems
Aerospace Engineering
Rail Engineering
Proving Ground & Events
Motorsport Engineering
Test Facility Engineering
Customer Facilities & Support
Home
//
Our Services
//
Proving Ground & Events
//
Test Tracks for Hire
//
Straight Line Wet Grip
Straight Line Wet Grip
Testing on the wet grip basalt surface.
Applications
Tyre tread pattern and compound development
Braking systems (ABS)
Traction control (ASR)
Aquaplaning
Vehicle appraisal and demonstration
Driver training
Type approval
Glass plate photography
Facility Description
800m approach road
Six noise-generating areas
Six braking surfaces of varying friction levels from 0.10 to 0.75 nominal
Braking surfaces contained within 200m length
Ability to carry out split-µ tests
Variable-level aquaplaning trough
Test Surface Details
Surface
Length & Width
Typical µ (wet)
Watering
Smooth Concrete
100m x 4m
0.40
Spray & Weir
Bridport (with Quartzite)
100m x 4m
0.40
Spray & Weir
Sand Asphalt - 2 Lanes
100m x 4m
0.40
Spray & Weir
Smooth Asphalt
100m x 4m
0.75
Spray
Basalt Tiles
200m x 7m
0.30
Spray
Ceramic Tiles
100m x 3m
0.10
Spray
Aquaplaning (smooth concrete)
66m x 4m
Spray & Direct
Case Studies.
Case Study: Research Into Driver Pedal Feel Preference.
Case Study: Delivering World-Class Defence Vehicle Capability Direct To The Front-Line.
Case Study: SAFERIDER.
Proving Ground & Events.
Test Tracks for Hire
Driver Training
Events
Contact Us.
+44 (0)24 7635 5000
Enquiries
21
May
EE-VERT Presented At TRA2012 Conference.
The recently held TRA Conference at the Megaron Athens AICC saw Senior MIRA…
Join our mailing list